A new bridge project in Xiongan New Area, China
Description
The bridge is located above the river and needed to be newly constructed without affecting the normal flow of the river. The construction team chose a Ringlock scaffolding because its high-strength steel components can withstand dynamic loads (such as vehicle vibration) and easily adapt to the curved design of the bridge. The scaffolding was erected in just half a month, 40% faster than traditional methods. Through segmented construction and nighttime operations, the project minimized river pollution. Ultimately, the bridge’s load-bearing capacity was increased by 50%, there were no safety accidents during construction, and it was delivered one month ahead of schedule, avoiding the impact of the river flood season. The adjustability, safety, and durability (corrosion-resistant treatment) of the Ringlock scaffolding are its core advantages.